Softwiro
Free Excel template

Maintenance requests and complaints log for owners' associations

A free Excel sheet for a log of maintenance requests and complaints in a building or compound. You record each report with its date, unit, type (elevator, electrical, plumbing, cleaning, security or other), priority, the person responsible and status. The sheet calculates how many days it has been open and warns you if it has taken longer than the time you set for its priority. It gives you a list of open reports starting with the oldest, and a summary of statuses, the most frequent types, average days to close and maintenance cost by month. All the reports in the sheet are illustrative examples.

Excel file (.xlsx) · 149 KB · 6 tabs · works in Excel and Google Sheets · no sign-up

The workbook is in Arabic (right-to-left, Arabic tab and column names). This page explains every tab in English.

The blank copy has the same formulas, charts and lists without the example data; categories and settings are ready.

Try the sheet here, on the example

The sheet is open below with sample numbers. Change any white cell and watch the results update, or press the blank-copy button to type your own data from scratch. Nothing you type leaves your browser.

Example from the sheet

Example from the “البلاغات” tab (Arabic), with the numbers and formulas that are in the file.
رقم البلاغتاريخ البلاغالوحدة / الموقعالنوعالأولويةالحالةالأيام المفتوحةالتنبيه
146176الدور 3مصعدعاجلةتم1
246188شقة 5سباكةعاليةتم2
346201المدخلكهرباءعاديةتم4
446208السلمنظافةمنخفضةتم7
546223الجراجأمنعاليةتم2
646232السطحسباكةعاديةتم5
746243الدور 2كهرباءعاجلةتم0
846252المصعدمصعدعاديةتم7
946267المدخلأمنعاليةتم2

Example from the “البلاغات” tab (Arabic), with the numbers and formulas that are in the file.

What is inside

  • "الإعدادات" (Settings): Today's date and a table of the allowed time in days for each priority: urgent, high, normal and low. You can change them as you like.
  • "البلاغات" (Reports): The log of reports: report date, unit or location, type, description, priority, person responsible, status (new, in progress, done or postponed), closing date and cost. The sheet calculates the report number, days open, allowed time and a "late" alert.
  • "المفتوحة" (Open): An automatic list of reports that are not finished, sorted from the oldest, with their location, type, description, priority, person responsible, status, days open and late alert.
  • "الملخص" (Summary): The number of reports in each status, open and late reports, average days to close, the number and cost of each type and the most frequent type, and the reports and cost for each of the last 12 months.

The file opens on a start tab (“ابدأ هنا”, Start here) that explains how to use it.

What makes it different

Open the "المفتوحة" (Open) sheet and the oldest unresolved report is at the top of the list, with the word "late" next to it if it has passed its time limit, so you do not have to search through WhatsApp messages. From the "الملخص" (Summary) sheet you see which type of fault keeps coming back and how much you spend on maintenance each month, so you can decide what deserves a maintenance contract or a permanent fix.

How to use it

  1. In "الإعدادات" (Settings), enter today's date and adjust the allowed time in days for each priority (urgent, high, normal and low).
  2. In "البلاغات" (Reports), log every report: its date, unit or location, type, description, priority, person responsible and status.
  3. When a report is resolved, change its status to "done" and enter the closing date and the cost.
  4. The sheet automatically calculates the report number and days open, and shows "late" if the days are more than the time for its priority.
  5. Open the "المفتوحة" (Open) sheet to find unfinished reports sorted from the oldest, and start with the ones at the top.
  6. Check the "الملخص" (Summary) sheet for the number of reports in each status, the most frequent types, average days to close and maintenance cost for each month.

Before you start:

  • The figures and reports in the sheet are illustrative examples for a made-up building. Delete them and enter your own reports.
  • An open report is any report whose status is not "done" (new, in progress or postponed). Its days open = today's date − the report date.
  • For a closed report, "days open" shows the time between the report date and the closing date, and this is the basis of the average days to close.
  • The sheet shows "late" for an open report if its days are more than the time set for its priority in the settings.
  • Each report's cost is counted in the month of its closing date. If it is not closed yet, it is counted in the month of the report date.
  • The sheet holds 1,000 reports, and the open sheet shows the first 100.

Excel file (.xlsx) · 149 KB · 6 tabs · works in Excel and Google Sheets · no sign-up

The workbook is in Arabic (right-to-left, Arabic tab and column names). This page explains every tab in English.

The blank copy has the same formulas, charts and lists without the example data; categories and settings are ready.

Free cheat sheet for this field

Terms, abbreviations, tables and diagrams over several pages, in Arabic and English. Download it as a PDF or images, including a phone-size version.

Cheat sheet: maintenance requests and complaints (1/3)Cheat sheet: maintenance requests and complaints (2/3)Cheat sheet: maintenance requests and complaints (3/3)
0 downloads · 3 pages

Still running this on Excel?

This sheet suits a start and a limited amount of data. If your way of working grows, or you need more than one person working on it at the same time, Softwiro can build you a program that fits the way you work.

In this sheetIn Custom Software from Softwiro
One file that one person edits at a time, and copies reach you on WhatsApp.A program with a login for each user and permissions you define, and everyone sees the same data.
You type everything and check the numbers by hand.We design the screens around your work steps, so each person records only what concerns them.
Columns and formulas are fixed as the sheet was designed.We build what you need: reports, alerts and screens your way.
Backups and security are your own responsibility.The program runs on a secured server with regular backups.

See Custom Software from Softwiro · Ask for a demo

Frequently asked questions

How are days open and the late alert calculated?

For an open report (status new, in progress or postponed), days open = today's date − the report date. The sheet shows "late" if the days are more than the allowed time for its priority in the settings. For a closed report, the time between the report and its closing is shown.

How is the average days to close calculated?

It is the average time between the report date and the closing date for reports with the status "done" that have a closing date, rounded to one decimal place.

In which month is a report's cost counted?

In the month of its closing date. If it is not closed yet and has a cost entered, it is counted in the month of the report date. The summary shows the last 12 months from today's date.

Can I change the allowed times?

Yes, edit the days in the settings table next to each priority. Do not change the priority names themselves, because the dropdown list in the reports sheet reads them from there.

Is the template free?

Yes, with no sign-up and no email address. Use it, edit it and share it as you like.

Does it work in Google Sheets and on mobile?

The sheet uses formulas supported by Excel 2016 and later, Google Sheets and LibreOffice, so you can upload it to Google Drive and open it with Google Sheets on a computer or a phone.

What is the difference between the white and the gray cells?

You type in the white cells; the gray cells are calculated automatically. Don't type in a gray cell, or you will erase its formula.

Can I use the sheet from an AI assistant?

Yes. Add our MCP server (URL https://softwiro.com/api/mcp, no key needed) to your assistant and ask it to do the calculation in this template. The numbers come from the sheet's own formulas, and we do not store your data. The steps and a ready-made prompt are in this article: https://softwiro.com/blog/mcp-excel-templates-ai-agent-guide.html

All the templates in this group: Compound and owners' association sheets: dues, maintenance and property

More free templates for: Owners associations and compounds

More free templates

All templates · Free tools