Try the sheet here, on the example
The sheet is open below with sample numbers. Change any white cell and watch the results update, or press the blank-copy button to type your own data from scratch. Nothing you type leaves your browser.
Example from the sheet
| الكود | المادة | الفصل | الحصص المخططة | الحصص المنفذة (محتسبة) | نسبة التغطية | دروس متأخرة | الحالة |
|---|---|---|---|---|---|---|---|
| عربي 1/أ | اللغة العربية | 1/أ | 12 | 6 | 50.0% | 2 | متأخرة عن الخطة |
| علوم 1/أ | العلوم | 1/أ | 10 | 9 | 90.0% | 0 | في الموعد |
| رياضيات 2/ب | الرياضيات | 2/ب | 21 | 9 | 42.9% | 2 | متأخرة عن الخطة |
| إنجليزي 2/ب | اللغة الإنجليزية | 2/ب | 6 | 3 | 50.0% | 0 | في الموعد |
| علوم 3/ج | العلوم | 3/ج | 5 | 0 | 0.0% | 0 | لم تبدأ |
| حاسب 2/ب | الحاسب | 2/ب | 3 | 3 | 100.0% | 0 | مكتملة |
Example from the “المواد” tab (Arabic), with the numbers and formulas that are in the file.
What is inside
- "الإعدادات" (Settings): Today's date (typed as the example date; replace it with =TODAY() so it updates by itself) and the number of grace days before a lesson counts as late (zero in the example). The sheet reads all its late alerts from here.
- "المواد" (Subjects): A code, subject name and class for each row. For each row the sheet calculates the number of lessons, lessons marked done, planned and counted taught periods, coverage %, late lessons and periods, and the subject status (complete, on schedule, behind plan, not started, or no lessons recorded). It holds up to 60 subject and class rows.
- "الدروس" (Lessons): One row per lesson: subject code, class, unit, lesson, planned periods, taught periods, planned teaching date, actual date, status (not started, in progress or done) and a prep note. The sheet calculates counted and remaining periods, a "behind plan" alert and a "check taught periods" alert. It holds up to 1000 lessons.
- "الملخص" (Summary): Number of subjects and lessons, planned and taught periods, overall curriculum coverage %, extra periods, the number of late lessons, periods and subjects, and two tables: lessons by status and subjects by status.
- "ابدأ هنا" (Start here): How to use the sheet, what the colors mean and notes on the calculations.
- "لماذا ما زلت على إكسل؟" (Why am I still on Excel?): What a custom program from Softwiro adds if your needs grow or you need more than one user.
The file opens on a start tab (“ابدأ هنا”, Start here) that explains how to use it.
What makes it different
Instead of comparing your lesson-plan notebook with the timetable at the end of term to see where you stand, you open "المواد" (Subjects) and see the coverage % and status of each subject and class. You open "الدروس" (Lessons) and see anything past its date in red. That way you know early where you need a make-up period, before time runs short.
How to use it
- In the "الإعدادات" (Settings) sheet, enter today's date (or =TODAY() so it updates by itself) and the grace days before a lesson counts as late.
- In the "المواد" (Subjects) sheet, enter for each subject and class a short code (for example: عربي 1/أ), the subject name and the class.
- In the "الدروس" (Lessons) sheet, enter the units and lessons of each subject yourself: code, unit, lesson, planned periods and planned teaching date.
- After each period, enter the periods taught and the actual date, choose the status (not started, in progress or done) and add a short line in the prep note.
- For each lesson the sheet calculates counted and remaining periods and shows "behind plan" when it is unfinished and past its date.
- Open "المواد" (Subjects) for the coverage % and status of each subject and class, and "الملخص" (Summary) for the overall picture.
Before you start:
- Units and lessons are entered by you; the sheet holds no ready-made curriculum, so enter what you actually teach, with the number of periods you planned.
- A lesson is behind plan if its status is not "done" and its planned date passed more than the grace days in the settings. A lesson planned for today is not counted as late.
- Counted periods in a lesson = the lower of taught and planned, so the percentage never goes above 100%. Extra periods are shown separately in the summary.
- Subject coverage = counted periods / planned periods across all its lessons.
- If the status is "done" but taught periods are fewer than planned, "check taught periods" appears so you can correct one of them.
- The sheet holds up to 60 subject and class rows and 1000 lessons. Keep prep notes short and free of personal data about students.
Free cheat sheet for this field
Terms, abbreviations, tables and diagrams over several pages, in Arabic and English. Download it as a PDF or images, including a phone-size version.
Still running this on Excel?
This sheet suits a start and a limited amount of data. If your way of working grows, or you need more than one person working on it at the same time, Softwiro can build you a program that fits the way you work.
| In this sheet | In Custom Software from Softwiro |
|---|---|
| One file that one person edits at a time, and copies reach you on WhatsApp. | A program with a login for each user and permissions you define, and everyone sees the same data. |
| You type everything and check the numbers by hand. | We design the screens around your work steps, so each person records only what concerns them. |
| Columns and formulas are fixed as the sheet was designed. | We build what you need: reports, alerts and screens your way. |
| Backups and security are your own responsibility. | The program runs on a secured server with regular backups. |
Frequently asked questions
Does the sheet include a ready-made curriculum?
No. Units, lessons and the number of periods are entered by you, and the sheet only calculates what you type. The example contains sample lesson names to show the idea, so delete them and enter your own plan.
How is subject coverage calculated?
Subject coverage = total counted periods / total planned periods of its lessons. For each lesson, the counted periods are the lower of taught and planned, so the percentage never goes above 100%. In the example, Arabic for class 1/A is at 50% (6 of 12 periods).
When does a lesson show as "behind plan"?
When its status is not "done" and its planned date passed more than the grace days set in the settings. A lesson planned for today is not counted as late. In the example there are four late lessons in two subjects.
Should I write notes about students in the prep column?
Write a short prep note about the lesson itself, such as materials to prepare or an activity you plan to run. It is best not to put personal data about students in the sheet.
Is the template free?
Yes, with no sign-up and no email address. Use it, edit it and share it as you like.
Does it work in Google Sheets and on mobile?
The sheet uses formulas supported by Excel 2016 and later, Google Sheets and LibreOffice, so you can upload it to Google Drive and open it with Google Sheets on a computer or a phone.
What is the difference between the white and the gray cells?
You type in the white cells; the gray cells are calculated automatically. Don't type in a gray cell, or you will erase its formula.
Can I use the sheet from an AI assistant?
Yes. Add our MCP server (URL https://softwiro.com/api/mcp, no key needed) to your assistant and ask it to do the calculation in this template. The numbers come from the sheet's own formulas, and we do not store your data. The steps and a ready-made prompt are in this article: https://softwiro.com/blog/mcp-excel-templates-ai-agent-guide.html
All the templates in this group: Excel templates for teachers: gradebook, lesson planning and follow-up
More free templates for: Teachers
More free templates
- Teacher weighted gradebook (Excel)
- Parent communication log for teachers (Excel)
- Remedial sessions tracker for teachers (Excel)
- Study groups management sheet for a private teacher
- Charity accounts by fund
- Strength workout log
- Running, cycling and swimming log
- Training load sheet for any sport (session-RPE)
- Athlete nutrition and macros sheet
- Football player match stats sheet
- Basketball player game stats
- Swimming times and personal bests