Softwiro
Free Excel template

Worker shift schedule in Excel (free): morning, evening and night + online version

Assign shifts for the week, see each employee's hours and rest days, and catch overtime or too little rest before you post the schedule.

5 min read

You run a team on three shifts and want a weekly schedule that leaves no shift short and treats no one unfairly with extra hours or no day off, and you want to know where it breaks your rules before you post it. The free shift schedule sheet does that: you pick a shift for each employee each day from a list, and it works out the rest and flags conflicts.

The problem it solves

A schedule on paper or in a group chat looks fine until the week starts. Then someone notices a colleague works an evening shift and comes back for a morning shift only eight hours later, that Wednesday night is one person short, or that an employee has had no rest day this week. Nobody adds up each person's hours or compares the end of one shift with the start of the next by hand. The sheet does it every time you change a cell.

How it works, step by step

  1. In الإعدادات (Settings) write the first day of the week, the maximum weekly hours, the minimum rest between shifts in hours, and the minimum rest days. These are values you set according to your work agreement and local law.
  2. In الورديات (Shifts) write each shift: name, start, end, break hours and the number of staff needed per day. The sheet works out paid hours; a night shift from 23:00 to 07:00 counts as 8 hours.
  3. In الموظفون (Employees) write code, name, job and hourly rate.
  4. In الجدول (Schedule) pick a shift for each employee each day from a list that holds the shifts plus "rest" and "leave".
  5. Read the status column beside each employee, open التغطية (Coverage) to see shortages per shift, then الملخص (Summary).

What each sheet does

  • Settings: four values that set the alert rules.
  • Shifts: shift definitions, hours and required headcount, with room for six work shifts.
  • Employees: up to 40 people with an hourly rate and an optional personal maximum.
  • Schedule: work, rest and leave days, weekly hours, extra hours, rest conflicts, cost and status.
  • Coverage: actual staff on each shift each day, the difference from what is required, and who is on rest or leave.
  • Summary: the indicators and three charts.

Walk-through on the sample numbers

The numbers below come from the sample in the file and are not real data. The sample has 12 employees and four shifts: morning 07:00 to 15:00, evening 15:00 to 23:00, night 23:00 to 07:00 and a 12-hour shift from 07:00 to 19:00, each with a one-hour break. Paid hours are therefore 7, 7, 7 and 11. The week totals 441 hours, an average of 36.75 per employee, costing 19,054 pounds at the hourly rates.

Three warnings appear. Gamal Awad on the long shift five days reaches 55 hours, 7 over the 48-hour limit in Settings. Tarek Shawky works the evening shift on Sunday and the morning shift on Monday, only 8 hours of rest against a minimum of 11, so the status reads "rest between shifts below the limit". Emad Fathy works six nights and takes one leave day but no rest day, so his status reads "rest days below the limit", because leave does not count as weekly rest. The other nine show "OK".

In Coverage the morning shift has 2 instead of 3 on Sunday and on Wednesday, so the week is short by two people, with a surplus on two evening days and two night days. You move someone from a shift with a surplus to the short one and watch the numbers change at once.

Common mistakes

  • Typing a shift name that differs from the one in Shifts: the status becomes "unknown shift".
  • Forgetting that leave is not rest: weekly rest is counted from the word "rest" only.
  • Scheduling a night shift at the end of the week followed by a morning in the next week: the sheet does not check across weeks, so review that yourself.
  • Treating the limits as official: they are numbers you set, so check local law and your work agreement.
  • Editing the grey cells: they are formulas, so type only in the white cells.

When to move to a system

When every employee wants to see their schedule on a phone, ask for a shift swap that a supervisor approves, or you need scheduled hours compared with actual attendance across branches, the file becomes limiting. Softwiro can build a system around how you work. For attendance and payroll, use the employee payroll and attendance sheet next to this schedule.

Try it now

Open the sheet and try it online or download the Excel file, clear the sample names, type your employees and shifts, and read the status column before you post the schedule. If you want something tailored, ask for it here.

Free cheat sheet for this field

Terms, abbreviations, tables and diagrams over several pages, in Arabic and English. Download it as a PDF or images, including a phone-size version.

Cheat sheet: worker shift schedule (1/3)Cheat sheet: worker shift schedule (2/3)Cheat sheet: worker shift schedule (3/3)
0 downloads · 3 pages

Questions this raises

How do I make a morning, evening and night shift schedule in Excel?

Write the three shifts in the Shifts sheet with their times and required staff, then pick a shift for each employee each day in the Schedule sheet. The sheet computes hours and rest days and shows shortages in Coverage.

How does the sheet find conflicts?

It compares the end of each day's shift with the start of the next day's shift; if the rest between them is below the limit in Settings, a warning appears, such as an evening shift followed by a morning shift. It also flags overtime, too few rest days and a shift typed with the wrong name.

Are the weekly-hours and rest limits legal values?

No. You type them according to your work agreement and local law; the numbers in the example are for illustration and are not official.

Can I schedule more than one week?

The schedule covers one week: change its start date or keep a copy of the file for each week. A night shift at the end of one week followed by a morning in the next is not checked, so review it yourself.

Have a system to build?

Softwiro designs, builds, and operates production systems. Describe what you need and we will come back with a scope rather than a slogan.

Start a project