A factory does not need production tracking software in general. It needs an answer to one of two questions: where is each order right now, or what is each order costing us while it runs. Most disappointing purchases come from buying an answer to the other question.
Seven questions to ask any vendor
- When is a record made? If supervisors write on paper and someone types it in later, the screen shows yesterday. Ask whether a supervisor can log pieces, a breakdown or a shortage from a cheap tablet at the line, at the moment it happens.
- Are handovers between stages confirmed? Quantities disagree between stages when a handover is assumed, not confirmed. The system should record who handed over how many, and who received them.
- Is lost time recorded with a reason? A floor that looks busy while output stays flat is losing time somewhere. Without a reason attached to each stop, you cannot tell a material shortage from a broken machine.
- Does it join stages to cost and to the contract? Many floors know their stages and their costs in two systems that never meet. Joined, an overrun is visible while it can still be acted on.
- Does it work in your language and direction? Right-to-left screens, Arabic labels and Arabic reports matter for the people who use it all day.
- Can you leave with your data? Ask how orders, stages and costs export, and who hosts the system.
- Can you try it on your own orders? A demo on sample data shows the screens. Your own orders show whether it fits.
Which kind of system fits which floor
- Stage-by-stage tracking of every product, from creation to finished goods, with workers, quantities and workflow: Production Manager.
- Garment lines where the problem is a bottleneck nobody sees until the shift ends: Fatlawiro shows each line's efficiency live, and the workstation holding it back.
- Orders under a contract, where the worry is cost: ProTrack ties each stage to what the job costs and computes expected and actual profit and the break-even point as work proceeds.
- Small and mid-sized workshops (wood, metal, plastics, assembly) that want one system from production order to shipping, hosted by themselves: MESwiro.
Mistakes to avoid
- Buying a system for the owner's report when the floor will not feed it.
- Tracking every possible number in the first month. Start with order status, output per stage and lost time.
- Treating the first month as a rollout instead of a test: run old and new in parallel for a few orders, and compare.
If you want a diagnosis before choosing, read factory production tracking problems, or contact us with how your floor works today.