Factory production tracking problems: symptoms, causes and where to start

A diagnostic guide for factory owners: each symptom on the floor, its usual cause, what to measure to confirm it, and where to start fixing it.

6 min read

Most factory owners do not start by searching for a system. They start with a symptom: shipments that slip without a clear reason, numbers that do not agree, a floor that looks busy while output stays flat. What you want is to work out which problem you actually have, what is causing it, and where to start — before anyone sells you a solution to a different one. This page is a diagnostic guide: each symptom, its usual causes, what to measure to confirm it, and the detailed article that deals with it.

It is written from garment and light-assembly floors, where these problems are most common, but most of it applies to any factory that makes products through a sequence of stages.

The symptoms, and where each one points

What you seeUsual causeWhat to measure firstRead next
Nobody can say quickly where an order isProgress is recorded on paper, in a group chat, or not at allTime taken to answer "where is order X?"Paper, WhatsApp and old Windows programs
Output below plan with no clear reasonA bottleneck operation, or lost time nobody recordsHourly output, and work waiting at each operationFinding the bottleneck on a sewing line
Efficiency looks fine but shipments are lateWrong standard minutes, or lost time hidden inside the figureOverall against on-standard efficiencyHow garment factories calculate production efficiency
Counts disagree between cutting, sewing and packingHandovers between stages not recorded by both sidesEvery count disagreement for one weekPaper, WhatsApp and old Windows programs
Fabric runs short, or consumption beats the costingMarker, lay-end, roll and defect losses not tracked per orderFabric issued against fabric accounted for, per cut orderFabric waste in garment cutting
Defects found at final inspectionQuality recorded late and away from the operation that caused itDefects at final inspection traced back to their operationPaper, WhatsApp and old Windows programs
Planning done from memoryNo live view of work in progress per lineHow often a plan changes because a line was not where it was thought to beWhat an MES is, and whether your factory needs one
Costs of an order known only after it shipsStage progress and cost kept in separate placesExpected against actual cost for the last few ordersWhat an MES is

Four problems underneath most of the symptoms

Read down the table and the same few causes keep appearing.

Progress is recorded late, or not at all

Paper tally sheets, messages in a group and a program in the office all share one weakness: they record what happened hours after it happened, by someone other than the person who saw it. Every decision on the floor is then made from yesterday's picture or from memory.

Handovers leave no trace

When one stage hands work to the next without both sides confirming the quantity, a shortage cannot be located. It turns into a recount and an argument, and the real cause — a lost bundle, a rejected batch never replaced, a short roll — is never found.

Lost time is invisible

Waiting for material, machine breakdowns and style changes are rarely recorded with a reason and a duration. Without that record, lost time disappears into a low efficiency figure and is blamed on the people sewing rather than on the cause.

Stages and costs live in different places

Most factories know their stages and know their costs, but in two places that never meet. An overrun on an order is then discovered at the end, when nothing can be done about it.

Paper-based tracking in particular

Paper is not the problem in itself. A well-designed paper form, filled in at the operation and collected every hour, can run a small floor well. Paper becomes the problem when the forms travel: when they are photographed and posted, typed into another system, summarised by someone who was not there, and read a day later. At that point every number exists in three versions and none is current. If your floor runs on paper, the question to ask is not whether to replace paper but how many hours pass between a form being filled in and a decision being made from it.

How to diagnose your own floor in one week

You do not need a system to find out which of these problems you have. For one week, on one line, record:

  1. Every stoppage: when it started, when someone who could fix it responded, when it ended, and why.
  2. Every count disagreement between stages, and how long it took to settle.
  3. Every request for an order's status, and how long the answer took.
  4. Work waiting at each operation, counted three times a day.
  5. Fabric issued and fabric accounted for, for every cut order that week.

At the end of the week, the largest numbers tell you where to start. The articles linked above go deeper into each one.

When a system is the answer, and when it is not

If your floor has one line and the owner is on it all day, better paper forms and a daily meeting may be all you need. A system earns its place when there are several lines or shifts, several orders on the floor at once, buyers asking for status and traceability, and an owner who can no longer see everything from where they stand. When you reach that point, what an MES is explains what such a system does, and comparing business software on evidence explains how to choose one.

The next step

Run the one-week diagnosis above on your busiest line. Softwiro builds and operates production tracking for factories — Production Manager, ProTrack and MESwiro are running in production today — and if you send us your week's numbers, we will tell you which problem we would solve first, including when the answer is not a system.

Sources

Questions this raises

What are the most common production tracking problems in a factory?

Orders whose status nobody can give quickly, output below plan with no recorded reason, quantities that disagree between stages, fabric or material consumption above the costing, defects found only at final inspection, and planning done from memory. Most of them come from progress being recorded late, handovers between stages not being confirmed, lost time not being recorded, and stage progress being kept apart from cost.

Is paper-based production tracking always a problem?

No. A well-designed form filled in at the operation and collected every hour can run a small floor well. It becomes a problem when the forms are photographed, retyped and summarised, and decisions are made a day after the events they describe.

How do I find out which problem my factory has?

Record, for one week on one line: every stoppage with its response time and reason, every count disagreement between stages, every request for an order's status and how long it took, the work waiting at each operation three times a day, and fabric issued against fabric accounted for per cut order. The largest numbers show where to start.