# Job orders Excel sheet (free): stages, hours, cost, profit

> Free Excel sheet for factory job orders: stages from cutting to inspection, machine hours, materials, cost, profit, delay days and a summary with charts.

Source: https://softwiro.com/blog/mechanical-job-orders-free-excel-online.html
Language: English
Softwiro, softwiro.com

---

Free Excel template

# Job orders sheet in Excel (free): stages, machine hours, cost and profit

Know where each order stands, which ones are late and what each one really cost you.

27 November 2026 5 min read

## In short

- Each order row gathers its stages, machine hours and materials, so cost and profit come from what you logged, not an estimate.
- Order status is calculated: not started, running, ready to deliver or delivered, with progress and the current stage.
- Delay days = actual (or today's) date minus the required date, with a red alert for late orders.
- Materials below their minimum are flagged with a suggested reorder quantity.
- The Summary counts profit for delivered orders only, because an open order's cost is incomplete.

You run a small factory or a mechanical workshop with ten job orders in different stages: one at cutting, one at welding, one finished but not yet delivered. At any moment you want to know where each order stands, which ones are late, what each really cost you, and whether it was worth it. The free [job orders sheet](https://softwiro.com/ar/templates/mechanical-job-orders) answers that from numbers you type while you work: the order, its stages, its materials and its machine hours.

## The problem: an order passes through five pairs of hands and nobody sees all of it

A job order is opened with a price, a quantity and a due date, then goes through cutting, machining, welding, assembly and inspection. Every stage uses materials and machine hours, but the figures end up scattered: materials with the storekeeper, hours on the supervisor's paper, the due date in the owner's head. You learn an order is late when the customer calls, and that it lost money only after you delivered it. The sheet gathers these numbers around the order number.

## How the sheet works, step by step

1. In Settings type today's date (or =TODAY()), your machine hour rate, the indirect cost percentage, then your stages in order and your product list.
2. In Materials (the sheet is named «الخامات», Arabic for raw materials) write each material or part with its price, opening balance and minimum.
3. For every request open a row in Job orders: number, customer, product, quantity, unit price, deposit and due date.
4. In Stages log each stage's status (not started, running or finished), planned and actual finish date and machine hours. In Materials used log what was issued to the order.
5. On delivery type the actual delivery date in Job orders. The status becomes "delivered" and the order enters the profit figures in the Summary.

## What each sheet gives you

- Job orders: status, progress, current stage, cost, profit, margin, balance due from the customer and days late.
- Stages: the stage log with a late-stage alert, filterable by order or stage.
- Materials used and Materials: the cost of every issue, each material's balance and a suggested reorder quantity for those below their minimum.
- Summary: the totals and four charts: orders by status, value, cost and profit per product, hours per stage and new order value per month.

## A walk-through on the sample numbers

The figures below come from the sample data in the sheet, which is fictional. Today's date in it is 26 November 2026, the machine hour is 250 EGP and indirect costs are 12%.

- Order JO-101 (10 steel doors): materials 21,070, machine hours 50 so machine cost 12,500, indirect costs 12% of (21,070 + 12,500) which is 4,028.40, so total cost 37,598.40. The order value is 10 × 4,200 = 42,000, so profit is 4,401.60, a 10.5% margin. It was delivered one day early.
- Order JO-102 (two tanks): value 32,000, cost 30,100, profit just 1,900 at a 5.9% margin, delivered 4 days late. This is the kind of order you only see once you cost it.
- Order JO-105: all five stages are finished, so it is "ready to deliver", but its due date was 15 November, so it is 11 days late. Its value is 54,000 and 34,000 is still due from the customer.
- Order JO-106: three of five stages are done (60% progress), the current stage is assembly, and with a due date of 20 November it is 6 days late.
- Totals: ten orders, four delivered with a value of 153,000 and a cost of 122,150.56, so profit of 30,849.44 at 20.2%. Open orders are worth 159,350 and customers still owe 214,350.
- Materials: three materials are below their minimum: the square tube, the paint and the heavy hinges. The sheet suggests ordering 24 tubes, 14 litres of paint and 38 hinges (minimum × 2 - balance).

## Common mistakes

- Forgetting to log an issued material or a stage's hours, so the profit looks bigger than it is.
- Reading the profit of an undelivered order as final, when its cost is incomplete.
- Finishing stages out of the order in the Settings list, which makes "current stage" wrong because it counts finished stages.
- Forgetting the actual delivery date, so the order stays "ready to deliver" and the delay keeps growing.
- Guessing the indirect cost percentage. Work it out from your monthly rent, electricity and wages divided by your machine activity.

## When to move to a system

The sheet is enough when one or two people type into it. If you want each worker to log the start and end of their stage from a screen, to receive late alerts, and to have material issues deducted from the store automatically, that is the job of a [production management system](https://softwiro.com/product/production). For finer store control use the [general inventory sheet](https://softwiro.com/ar/templates/general-inventory).

## Your next step

Download the sheet, type your real machine hour rate and stages in Settings, then open the job order running right now and log its stages and materials to date. You will see its cost, its progress and its delay before the customer calls.

## Common questions

**Do I log each stage on its own row?** Yes, one row per stage of each order. You can log the running stage with its hours so far and change it to "finished" when it ends.

**Does it suit stages other than these five?** Yes, rename the stages and change their number (up to 8) in Settings.

**Are the sample numbers real?** No, they are fictional to show the calculation. Clear them and type yours.

## Free cheat sheet for this field

Terms, abbreviations, tables and diagrams over several pages, in Arabic and English. Download it as a PDF or images, including a phone-size version.

[![Cheat sheet: job orders (1/3)](https://softwiro.com/uploads/cheatsheets/mechanical-job-orders/en-1.jpg)](https://softwiro.com/uploads/cheatsheets/mechanical-job-orders/en-1.jpg)[![Cheat sheet: job orders (2/3)](https://softwiro.com/uploads/cheatsheets/mechanical-job-orders/en-2.jpg)](https://softwiro.com/uploads/cheatsheets/mechanical-job-orders/en-2.jpg)[![Cheat sheet: job orders (3/3)](https://softwiro.com/uploads/cheatsheets/mechanical-job-orders/en-3.jpg)](https://softwiro.com/uploads/cheatsheets/mechanical-job-orders/en-3.jpg)

0 downloads · 3 pages

## When your work grows: a custom system instead of the sheet

A sheet is a great start. When more than one person works on your data, when it grows, or when you need alerts and reports of your own, we build you a custom system at competitive prices. This is what changes:

| In the sheet | In a custom system |
| --- | --- |
| One file that one person edits at a time, and copies travel by WhatsApp. | A program with a login for each user and permissions you set; everyone sees the same data live. |
| You type and check every number by hand, and one wrong cell breaks the result. | Screens built around your steps: each person records only their part, and the calculations run on their own. |
| Limited size; the file slows down as the data grows. | Holds years of data without slowing down, with instant search and filters. |
| Fixed columns and reports, as the sheet was designed. | Reports, alerts, printing and WhatsApp built around how you work. |
| Backups and security are your own responsibility. | A secured server with automatic backups and a log of who changed what and when. |

### Extra features in the app

- A login for each user with permissions, and a log of who changed what and when
- Automatic reminders and alerts by WhatsApp and email
- Photos, files and documents kept with each record
- Instant search and filters, with reports exported to PDF and Excel
- Works from a phone anywhere, with automatic backups

[Ask for your custom system](https://softwiro.com/contact)

## Questions this raises

### How do I calculate the cost of a job order in a mechanical workshop?

Log the order's materials in Materials used and its machine hours in Stages. Order cost = materials cost + machine hours x hour rate + indirect costs at a percentage you set. Profit = order value - cost.

### When does the sheet treat an order as late?

When its required delivery date is before today's date in Settings and no actual delivery date has been typed, it shows as late. If it was delivered after its due date it shows as delivered late, with the number of days.

### Can I change the stage names?

Yes. In Settings you can type up to 8 stages in order (cutting, machining, welding, assembly and inspection in the sample), and the Stages lists and the Summary follow them.

### Why does the Summary count profit for delivered orders only?

Because an open order's cost is incomplete until its stages finish and its materials are issued, so its profit looks bigger than it is. After delivery the cost is complete and profit becomes comparable.